|
This first activity
involves three parts, found in the Process Control Participant
Journal
and a followup activity
for two additional variable control charts (median and Average
and std deviation) and the use of the Shannin's concept of Precontrol
|
(1)
The First Session understanding the background
for choosing the right control system - Process Dominance |
(2)
Are We Too Cool Scenario 1 using an Individual
and moving range control chart (Ind and movR) to measure the
temperature varation within a room over two different time span,
and |
(3)
the Average and Range Chart (X Bar and R) using either Are
We Too Cool Scenario 2 Multiple Temperature Readings
|
Creating other variable control charts
to control pasta variation using:
- Median and Range charts
- Average and standard deviation charts
(s)
- Precontrol
Choosing the right variable chart to control
your process.
|